Authors, OPS-DIR, I have reviewed draft-ietf-tls-downgrade-scsv-03 as part of Last Call reviews provided by OPS-Dir. The memo seems ready to publish, and contains a section on operational considerations for server upgrades (which can be conducted more smoothly if the recommendations are followed). I only suggest to highlight the presence of these considerations in the abstract, so operators are more likely to find them. Something like: "Server upgrade considerations are included." Thanks for preparing that section. regards, Al